National Composites Center, Bristol.

National Composites Centre Phase 2, Bristol On Behalf Of Sir Robert McAlpine

I

n April 2014 Harlech Industrial Doors were awarded the NCC Phase 2 contract by main contractor Sir Robert McAlpine to supply and install 13no electrically operated sectional overhead doors internally and externally, 2no internal fire roller shutters and 45no steel hinged doors situated all around the external build.

With another door supplier letting McAlpines down on the project, Harlech Doors were appointed the specialist door contractor to take over and install all industrial doors to the project. With very little time to spare Harlech Doors started the design element of the project on all the doors and once signed off the project really kicked into gear with many steel doors required to secure the building, Harlech Doors highly trained installation team started installing steel doors to the external of the build in timely fashion.

The project was a challenging one from the beginning to the very end installing large quantities of doors in such a limited time but Harlech Industrial Doors were able to achieve this and maintain there high quality assurance on each door supplied.

‘With limited storage space we had to work very closely with other trades to ensure that we did not prevent them from working. It was a real pleasure to see the finished building with our various products all working’

Matt Pitt, Sales Director Harlech